Metadata
WORK ID: YFA 6747 (Master Record)
Title | Year | Date |
EWDEN EXPERIMENTAL TANK - STILLING POOLS AND BELLMOUTHS NO. 2 | 1936 | 1936-05-19 |
Details
Original Format: 16mm Colour: Black & White Sound: Silent Duration: 19 mins Genre: Scientific Subject: Science/Technology Industry Environment/Nature Architecture |
Summary This film shows experiments carried out to measure the water flow and drainage through open concrete pipes and bellmouth spillways at Ewden 14th-19th May 1936. |
Description
This film shows experiments carried out to measure the water flow and drainage through open concrete pipes at Ewden 14th-19th May 1936.
Water is shown splashing through concrete tunnels and open-pipes, with different parts of the system labelled with different numbers.
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway is shown with a worker holding a sign next to it which reads ‘Expt 20, Ht 2’-5, Q 2100.'
Another sign is shown which reads ‘Expt 20, Ht 3’-0, Q...
This film shows experiments carried out to measure the water flow and drainage through open concrete pipes at Ewden 14th-19th May 1936.
Water is shown splashing through concrete tunnels and open-pipes, with different parts of the system labelled with different numbers.
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway is shown with a worker holding a sign next to it which reads ‘Expt 20, Ht 2’-5, Q 2100.'
Another sign is shown which reads ‘Expt 20, Ht 3’-0, Q 2800’.
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway is shown with a worker holding a sign next to it which reads ‘Expt 20, Ht 4’-0, Q 3350.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway is shown with a worker holding a sign next to it which reads ‘Expt 20, Ht 7’-0, Q 3900.’
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 21, Ht 2’-5’, Q 2100.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 21, Ht 3’-9’, Q 3570.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 21, Ht 6-9, Q 3570.’
A bellmouth spillway is shown as water pours down it.
Water flows from a pipe as a worker is holding a sign next to it which reads ‘Expt 21, Ht 9’-0”, Q4120’.
The water is shown splashing down from the pipe through the open tunnel.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 22, Ht 4’-0”, Q 3850.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 22, Ht 7’-0”, Q 4120.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 22, Ht 8’-0”, Q 4120.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 25, Ht 3’-0”, Q 2800.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 25, Ht 3’-7”, Q 3710.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 26, Ht 5’-2”, Q 4000.’
A bellmouth spillway is shown as water pours down it.
A worker removes the top circular component of this particular bellmouth spillway.
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway is shown with a worker holding a sign next to it which reads ‘Expt 26, Ht 5’-2”, Q 4000.’
The worker puts the extra structural component back on.
A bellmouth spillway with different structural components shown with a worker holding a sign next to it which reads ‘Expt 26, Ht 5’-2ST, Q 4120.’
A bellmouth spillway is shown as water pours down it.
A bellmouth spillway with different structural components is shown with a worker holding a sign next to it which reads ‘Expt 26, Ht 5’-3ST, Q 4120.’
A bellmouth spillway is shown as water pours down it.
A worker puts wood debris in the water. It gets sucked immediately towards the middle of the bellmouth.
A bellmouth spillway is shown as water and debris pours down it.
Two workers are seen looking happy; they get out some cigarettes and lighting them.
|